Getting out of Corvallis on the new Van Buren Bridge should be a breeze — in about four years. That’s how long ODOT figures it will take to complete construction of the $85 million project, which is starting now.
Posted in: Bicycling, Commentary, News
Tags: bridges, Corvallis, Highway 20, highways, left turns, ODOT, Van Buren bridge, Willamette River
Tags: bridges, Corvallis, Highway 20, highways, left turns, ODOT, Van Buren bridge, Willamette River
Looking at bridge replacement … in Corvallis
Watching the dismantling of the Van Buren Bridge in Corvallis may give some people the idea or hope that Albany’s Ellsworth Bridge may some day be replaced as well. But that’s not likely unless a huge earthquake levels Albany’s downtown first.
Tags: downtown congestion, Ellsworth Bridge, Highway 20 study, ODOT, Van Buren bridge, Willamette River