A perspective from Oregon’s mid-Willamette Valley
Another update from the freeway beat about that cable barrier being installed on I-5 from the Harrisburg exit toward Albany:Â I’m wondering about its placement fairly close to the left-hand lanes.
Not much room to pull off
Another update from the freeway beat about that cable barrier being installed on I-5 from the Harrisburg exit toward Albany:Â I’m wondering about its placement fairly close to the left-hand lanes.
Tags: I-5 cable barrier, Interstate 5, ODOT