Why America can’t fix its bridges

Written November 24th, 2014 by Hasso Hering
Albany's Ellsworth Street Bridge dates from 1925 but has been kept up.

Albany’s Ellsworth Street Bridge dates from 1925 but has been kept in good shape.

We are hearing a lot these days — most recently on CBS’s “60 Minutes” on Sunday — about the sad shape of the highways and bridges in this country, and how politicians in Congress are refusing to raise the gas tax to fix this failing “infrastructure.” Maybe more could be done if we found a way to cut the amount of money and time that this work takes.

You have to wonder how people especially in Oregon paid for all those magnificent bridges we have today and built them in just a few years, at a time when the state’s population and gas-tax-paying drivers was a fraction of what it is now.

President Eisenhower signed the bill providing for the interstate freeways in 1956. The act raised the federal gas tax from 2 to 3 cents per gallon at a time when America had about 170 million people and maybe half that many motor vehicles. Now we have about 320 million people, most of them with a car, and the federal gas tax is 18.4 cents.

Even though vehicles are more efficient, they are also far more numerous and are driven much farther than 60 years ago, and yet the federal Highway Trust Fund is running on empty. So where is all that tax money going?

Much of it, I suspect, goes into processes that don’t result in actual construction or repairs. And some goes into construction projects whose costs have become astronomical. Last year, Oregon completed a new Interstate 5 bridge across the Willamette River in Eugene, the “Whilamut Passage.” It cost about $204 million, but that included expenses other than the $150 direct construction costs. This new bridge replaced an I-5 bridge that had been constructed in 1961 at a cost of $2.3 million, according to the Eugene Register-Guard.

Yes, inflation — obviously. But we now spend many years on planning, public involvement, environmental reviews and consultations with stakeholders including Indian tribes and artists and so forth. And all of it costs money.

At least Whilamut Passage is a real bridge, and a very nice one. About 100 miles to the north, Oregon was spending about 10 years and more than $150 million of highway money on planning for a new Columbia River bridge, which would cost around $2 or $3 billion but will not even be started because the other side of the river objects to a streetcar line being included in the design. (And apparently because of the rail element, the bridge would have to be low enough to cut off some commercial river transportation. Brilliant!)

Meanwhile, closer to home, ODOT has spent several years trying to eliminate a 10-mile, looping segment of Highway 20 west of Eddyville by constructing a 5-mile shortcut. Unforeseen landslides caused all kinds of delays, and ODOT now plans to have that road finished in 2016 at a total cost of about $366 million. For that amount of money, motorists are going to save about 10 minutes on the drive to the coast. Is it worth all that money?

The CBS program highlighted bridge and highway problems elsewhere. In Oregon, ODOT has actually done a great job keeping I-5 in top shape and also, under the state’s OTIA III program, repairing more than 260 bridges. But costs and processes are likely similar across the country. There will never be enough tax revenue to fix the bridge and highway problems in America unless the country finds a way to get public works done for much less. (hh)

I-5 south of Cottage Grove was being rebuilt this year.

I-5 south of Cottage Grove was being rebuilt this year.





11 responses to “Why America can’t fix its bridges”

  1. STEVE GEDDES says:

    I have many of the same thoughts as I drive or ride my bike around the mid-valley.How in the world did past generations pay for all the infra-structure that today we can’t seem to afford to repair.It seems that companies, the few that are big enough to bid on large projects, see public works as a golden goose. A number of years ago, a truck hauling a piece of heavy equipment hit and bent the crossmember clearly visible in the picture above. To the best of my recollection, the repair cost…afraid to quote a figure here as I know Hasso will research it…was in the six figures and took just a few days to complete.More than the price of a house that takes months to build.

  2. Roger says:

    You are absolutely right.

  3. Rich Kellum says:

    We are regulating ourselves into oblivion. it is done at all levels of government, people of good conscience making rules without a thought to the future consequences of their actions. We demand that people be paid far higher for public projects than they are paid for the private project next door, doing the exact same work. We allow one government agency to use our money to fight another government agency in court and WE pay for both agencies and the fight and it many times is not what we wanted to begin with. OK off my soapbox now.

  4. Bob Woods says:

    “But we now spend many years on planning, public involvement, environmental reviews and consultations with stakeholders including Indian tribes and artists and so forth. And all of it costs money.”

    Very true. You need look no further than Albany to see irate conservatives demand that replacement of police and fire facilities be put to a public vote. These are the same people that scuttled the last bond, because they didn’t get to formulate it themselves.

    The machinery of government is generally designed to allow elected officials make the decisions and move forward. In our politics these days that is unacceptable because a segment of the population regularly tars government as inherently bad, and they make little distinction between the federal government and the city.

    While regulations have clearly made costs go up, they have also helped minimize sins of the past. Salmon runs are less endangered because of in-stream construction in the migration season is no longer allowed.

    There’s no such thing as s free lunch. Whether its regulations or endless demands of public votes on every issue, they all cost money. And our air and waters are vastly cleaner then they were when I was a child growing up, and I’m thankful for that.

    • James Carrick says:

      Bob, you wrote: “….. irate conservatives demand that replacement of police and fire facilities be put to a public vote.” Tell us, do you have a better alternative than voting on bond measures? Perhaps you prefer the executive decree, as King Barack has done at the federal level? And next time leave out the word “irate.” There are a plethora of adjectives I could use toward liberals/progressives, or whatever “politically correct” label people of your ilk prefer these days. Myopic is the first that comes to mind and will do nicely for this discussion. .

      You also said: ” a segment of the population regularly tars government as inherently bad, and they make little distinction between the federal government and the city.”

      First, that a significant portion of the population views government with skepticism is hardly new. Our founders used that skepticism when drafting the Constitution to LIMIT government power.

      To your second point, don’t insult people just as intelligent as you fancy yourself to be. Believe me, we know the difference between the federal, state, and local levels of government. Perhaps you need to recognize that it is at the local level where our votes count the most and where our individual voices can be best heard.

      Counselor Kellum is correct when he says we are regulating ourselves to death. Construction costs have outpaced inflation considerably, almost entirely because of regulatory requirements and costs to do almost anything these days. Many of these regulation are not much more than job security for bureaucrats and there is a significant amount of redundancy between state and federal agencies.

      Yes, I’m aware that elections cost money…and that there is no free lunch. So is everyone else. And if we are again presented with more or less the same proposals, voters will likely deliver the same result.

  5. Hasso Hering says:

    Bjorn Warloe commented on Facebook: “The rail was for light rail not a street car and was not the reason for the height problem which was really caused by odot ignoring the coast guard. There were many reasons to oppose the crc freeway expansion though as it spent far more than needed and had little to do with building a bridge or better connecting Vancouver and Portland. Please take a few minutes to learn about the common sense alternative that was proposed. A Common Sense Alternative to the CRC: http://youtu.be/sPB1jtmHVkk

  6. Ken says:

    If you want to look at the high cost of overhead in doing road construction in Oregon, take a look at the newly remodeled State of Oregon Dept of Transportation Building on the Capitol Mall. I was told it cost $4.5 million dollar remodel. (Why?) Then to get a deeper understanding of the problem try to find a engineer designing roads in the building. (Apparently, there are none. There wasn’t any room left for them.) It seems to me that the whole building is full of administrators, IT staff, HR, accountants and the like. (Do you think that type of operation just might drive up road costs a bit?)

  7. Bill Kapaun says:

    I think bidders are required to pay “prevailing wages” or some such definition which really means UNION Wages.
    I’ve noticed the “Putting Oregon(ions?) To Work” signs on some projects, in which it seems most are won by out of state contractors that don’t have as many hoops to jump through as Oregon owned businesses.

    • Hasso Hering says:

      I’m sure all contractors on ODOT projects are held to the same standards. (hh)

    • James Carrick says:

      The Davis-Bacon Act of 1931 requires contractors doing work on federally funded public works projects (including subcontractors) to pay their employees the “prevailing wage” in each construction specialty. This “prevailing wage” varies by trade and is tied to the currently negotiated union hourly rate PLUS the current benefit package negotiated by each trade union in each union jurisdiction. In other words, a prevailing wage rate in say, Colorado may be different than in Oregon.

      The act does NOT require that contractors be signatory to the union(s) but non-union employees, by law, must be paid the union hourly rate PLUS the hourly “fringe (benefit) rate” for each hour worked. The prevailing wage varies by trade and union jurisdiction and is calculated by where the project is built. These rates are carefully spelled out in all contract specifications for each project, ensuring a level playing field in the bidding process.

      Incidentally, Oregon law requires that the low bid be accepted with few exceptions, and a contractor’s failure to enter into a contract after being the successful low bidder will usually result in forfeiture of their “bid bond” (10% of bid $), also required to bid, by law, to ensure responsible bidding. Additionally, a “performance bond” is required to enter into a public contract to ensure the general contractor completes the work according to the plans and specifications (plus change orders), also referred to as the contract documents. These rules apply to general (primary) contractors and usually do not extend to their subcontractors because subcontractors are under contract to the general contractor and not to the public agency directly. General contractors alone are liable for the performance and bid integrity of the subcontractors they use. These requirements have been in place for many, many years now.

      The following link will provide access to the various prevailing wages for each specialty in the various jurisdictions and parts of Oregon:

      http://www.oregon.gov/boli/WHD/PWR/Pages/July_2014_Index.aspx

      For example, a journeyman carpenter working on a bridge project (Zone 1 – Group 5 concrete forming and placement, etc) would be paid the hourly rate of $34.44. If the worker belongs to the Carpenter’s Union he/she would receive the union fringe benefits package as compensation (currently valued at $14.83 per hour). If the worker was a non-union employee, he/she would receive the “fringe rate” on his paycheck IN ADDITION to the hourly rate for a total of $49.27 ($34.44 + $14.83 in lieu of the union benefits) per hour on their paycheck.

      The State of Oregon adopted the “Little Davis-Bacon Act” in 1959 for state funded public projects. This applies to all publically funded projects in Oregon, be it state funded or locally funded (city, county, school district, etc.).

      http://www.oregon.gov/boli/whd/pwr/Pages/w_pwr_oregonpwr.aspx

      The information on this link provides the reasoning for the law. I hope this erases some of the confusion and misconceptions of prevailing wage law.

      No matter how one feels about these public contracting laws, It’s hard to blame Davis-Bacon for the rise in construction costs because there has been little change in these laws for decades.

  8. Bill Kapaun says:

    They may be held “to the same standards”, but having their offiices in Washington state lowers their cost to DO business and they win the bids.

 

 
HH Today: A perspective from Oregon’s mid-Willamette Valley
Albany Albany City Council Albany council Albany downtown Albany housing Albany parks Albany Planning Commission Albany police Albany Post Office Albany Public Works Albany riverfront Albany schools Albany Station Albany streets Albany traffic Albany urban renewal Amtrak apartments ARA Benton County bicycling bike lanes Bowman Park Bryant Park CARA climate change COVID-19 Cox Creek Crocker Lane cumberland church cycling Dave Clark Path downtown Albany Edgewater Village Ellsworth Street bridge Highway 20 homeless housing Interstate 5 land use Linn County Millersburg Monteith Riverpark North Albany North Albany Road ODOT Oregon legislature Pacific Boulevard Pacific Power Portland & Western Queen Avenue Railroads Republic Services Riverside Drive Santiam Canal Scott Lepman Talking Water Gardens The Banks Tom Cordier Union Pacific urban renewal Water Avenue Waterfront Project Waverly Lake Willamette River


Copyright 2024. All Rights Reserved. Hasso Hering.
Website Serviced by Santiam Communications
Hasso Hering